ADNOC Drilling wins $733M Deal for AI-Enabled drilling rigs at offshore Zakum Field


The rigs will be constructed by Honghua Group, with delivery and operations at Zakum expected to begin sometime in 2026
这些钻井平台将由宏华集团建造,预计Zakum的交付和运营将于2026年开始

In a $733 million contract awarded by ADNOC Offshore, ADNOC Drilling will be deploying three ‘island’ drilling rigs for operations at the offshore Zakum field in Abu Dhabi. These new rigs will operate on both existing and newly constructed artificial islands, focusing on drilling and well completion.
在ADNOC Offshore授予的一份价值7.33亿美元的合同中,ADNOC Drilling将在阿布扎比的Zakum海上油田部署三个“岛屿”钻井平台。这些新钻井平台将在现有和新建的人工岛上作业,重点是钻井和完井。

According to reports, the contract follows existing agreements, with ADNOC Drilling’s revenue supported by long-term duration and guaranteed returns. Capital expenditure for the new rigs will be approximately $210 million, mostly occurring in 2025. ADNOC Drilling expects the first full year of revenue from these rigs in 2027.
据报道,该合同遵循现有协议,ADNOC钻井公司的收入得到长期持续时间和保证回报的支持。新钻井平台的资本支出约为2.1亿美元,主要发生在2025年。ADNOC Drilling预计这些钻井平台的第一个全年收入将在2027年实现。


追加内容

本文作者可以追加内容哦 !